Manufacturing Feedstock Opportunity Study Prepared by Carbotura, Inc. · Confidential

Newport's ~130 TPD of manufacturing feedstock flows to an Energy Recovery Facility under a Prosiect Gwyrdd partnership contract running to approximately 2040 — with no post-contract destination confirmed.

§0 — What This Means

Newport City Council met the Welsh Government's statutory 70% recycling target in 2024–25 — the first year the target applied at this level — reducing residual kerbside feedstock by 25% since 2022/23. The remaining ~130 TPD of non-recycled material flows predominantly to Viridor Waste Management Limited's Cardiff Energy Recovery Facility under the Prosiect Gwyrdd regional partnership. That contract runs to approximately 2040–41, with a five-year extension option.

The contract structure is the primary access constraint on Newport's manufacturing feedstock system. Approximately 61 TPD of residual kerbside and HWRC feedstock is contractually committed to the Cardiff ERF. Non-contracted streams — food waste, garden waste, commercial residual, biosolids, and C&D material — total an estimated 48–69 TPD and are accessible without contract renegotiation.

Newport's manufacturing feedstock cost baseline is structurally exposed. UK landfill tax reached £126.15 per tonne in April 2025. Newport's ERF disposal cost is undisclosed under Prosiect Gwyrdd commercial terms, but comparable South Wales municipal EfW gate fees are estimated at £95–115 per tonne. These costs escalate under both mechanisms.

Newport is the fastest-growing local authority in Wales by population rate (+1.7% in 2023–24). Feedstock volumes are likely to grow with population even as per-household intensity declines. Post-2040 feedstock planning is an open question with no disclosed successor strategy.

Dŵr Cymru Welsh Water operates five wastewater treatment works within Newport's boundary, generating an estimated 2,500 tpy of biosolids currently managed under land application — a stream under increasing regulatory and agronomic pressure as nutrient limits tighten.

Newport City Council · Manufacturing Feedstock System Overview

§1 — Feedstock Profile

ACM Capability Finding
ACM is confirmed capable of processing every material stream Newport City Council generates. Every classification in this section reflects an access constraint — not a capability limit. The barrier to any stream is contractual, logistical, or regulatory — never technical.

§1.1 — Material Stream Inventory

total">
StreamVolume (tpy)TPDSourceAccess ClassificationNotes
Kerbside residual household14,83240.6VERIFIEDCONDITIONALCommitted to Prosiect Gwyrdd / Cardiff ERF ~2040–41
HWRC residual~7,500~20.5ESTIMATEDCONDITIONAL1 HWRC at Maesglas; flows to Cardiff ERF under Prosiect Gwyrdd
Commercial / trade residual~8,000~21.9ESTIMATEDCONDITIONALNew mandatory source-separation rules April 2024; residual fraction post-separation
Food waste (captured kerbside)~5,500~15.1ESTIMATEDIMMEDIATEWeekly collection via Wastesavers; not ERF-committed
Garden waste~7,000~19.2ESTIMATEDIMMEDIATEThree-weekly, March–November seasonal; not ERF-committed
Biosolids (Dŵr Cymru Welsh Water)~2,500~6.8ESTIMATEDACCESSIBLE5 Newport WWTPs; land application via Biosolids Assurance Scheme
C&D residual / specialist~2,000~5.5ESTIMATEDACCESSIBLENewport City Council landfill; includes asbestos-category specialist streams
Total Addressable~47,332~129.7All streams confirmed within ACM capability
Access Classification Note
IMMEDIATE = available without third-party contract renegotiation. CONDITIONAL = requires contract transition or supplementary agreement. ACCESSIBLE = requires service agreement with stream operator. No classification implies an ACM capability limitation.

§1.2 — Residual Stream Composition

Based on Newport City Council's 2022 waste composition analysis of non-recyclable bins, over 24% of residual bin contents comprised food matter and 14% comprised dry recyclables — both misclassified. Following the three-weekly collection changes and Wastesavers kerbside enhancements in 2023–24, WRAP data confirms a 30% reduction in dry recyclables in the residual bin and a 17% reduction in food matter. The remaining residual is therefore skewed further toward true non-recyclable material — a higher-quality manufacturing feedstock composition.

Manufacturing Feedstock by StreamNewport City Council
Non-contracted streams (food, garden, biosolids, C&D) total an estimated 34–48 TPD — sufficient for Phase Initial without Prosiect Gwyrdd renegotiation.
Source: WRAP Wales 2025 (kerbside residual verified); all other streams estimated from Welsh national benchmarks · Carbotura analysis March 2026

§1.3 — Seasonal and Structural Variation

Garden waste is seasonal (March–November). Three-weekly collection means peak-season volumes significantly exceed annual averages. Newport's population growth (+1.7% per year, highest in Wales) will generate upward feedstock pressure against declining per-household intensity. Welsh Government 'Beyond Recycling' targets may tighten further post-2025, potentially reducing accessible residual volumes in the medium term. April 2024 mandatory commercial source-separation rules create new structured commercial feedstock as the separation regime matures.

§2 — Regulatory Baseline

§2.1 — Welsh Government Statutory Framework

RequirementThresholdNewport Status (2024–25)
Recycling Rate Target70% by 2024–25 ('Beyond Recycling' 2021)✓ MET — Newport confirmed in 12 of 22 Welsh authorities meeting the target
Landfill Diversion DutyProgressive annual BMW limits (Landfill Allowances Scheme)✓ Met — Newport landfill is contingency/specialist only
Mandatory Workplace SeparationAll businesses, charities, public sector from April 2024ActiveNewport City Council commercial guidance in force
Food Waste Sewer BanApril 2024, WalesActive
Fine Exposure: Newport was exposed to fines exceeding £500,000 per year under the 70% target prior to 2024–25 compliance. Meeting the target eliminates direct fine exposure — but a Welsh Government data quality note (January 2026) indicates headline recycling rates may be overstated by at least 1 percentage point nationally due to wood recycling reporting issues.

§2.2 — UK Landfill Tax Trajectory

YearStandard Rate (£/tonne)Change
2023–24£102.10
2024–25£103.70+1.6%
2025–26£126.15+21.6% (single year)

The 21.6% single-year increase materially increases the cost of any fallback to landfill disposal. Newport's own landfill operation is now structurally expensive as a primary disposal route. Its role as a contingency and specialist facility (asbestos-category streams) is the rational configuration given this tax structure.

§2.3 — Welsh Water Regulatory Pressure on Biosolids

Dŵr Cymru Welsh Water is under active Ofwat enforcement investigation (opened July 2024) for management of wastewater treatment works. Regulatory tightening on biosolids in Wales is consistent with UK-wide trends: nutrient limits on agricultural application have tightened, and Welsh Water's own Sewage Sludge Strategy 2040 acknowledges land application as a progressively constrained route. The five Newport wastewater treatment works therefore generate a feedstock stream under growing disposal cost pressure.

§3 — Current Cost Structure

Data Gap: All disposal cost figures for the Prosiect Gwyrdd EfW route are estimated. Prosiect Gwyrdd commercial terms with Viridor Waste Management Limited are not publicly disclosed. Figures below reflect South Wales municipal EfW benchmarks only.

§3.1 — Primary Disposal Route: Cardiff Energy Recovery Facility

Operator: Viridor Waste Management Limited (NRW Permit EPR/LP3030XA). Location: Trident Park, Glass Avenue, Ocean Way, Cardiff CF24 5EN. The Cardiff ERF is the largest Energy Recovery Facility in Wales, treating 350,000 tpy from five Prosiect Gwyrdd partner authorities: Caerphilly, Cardiff (lead authority), Monmouthshire, Newport, and Vale of Glamorgan.

ParameterValueSource
Contract signedDecember 2013VERIFIED
Operational fromApril 2016 (full services)VERIFIED
Contract duration25 yearsVERIFIED
Estimated expiry~2040–41ESTIMATED
Extension option5 years (~2045–46)VERIFIED
Combined waste committed (five authorities)172,000 tpy (at contract signing)VERIFIED
Contract lifetime value~£1.1 billion (at contract signing)VERIFIED
Estimated disposal cost (Newport share, per tonne)£95–115/tonne Data GapESTIMATED

§3.2 — Secondary Route: Newport City Council Landfill

Operator: Newport City Council (self-operated). Location: Docks Way, Newport. Role: contingency disposal; specialist streams including asbestos-category. Landfill tax exposure: £126.15/tonne (2025–26 standard rate). The economic case for primary landfill use has been eliminated by tax trajectory. Newport's own landfill continues to operate for specialist streams excluded from EfW and as contractual contingency when Cardiff ERF is offline for maintenance.

§3.3 — Kerbside Recycling Partner: Wastesavers Charitable Trust Ltd

Wastesavers is a social enterprise and charity operating Newport's full kerbside-sort recycling service under a longstanding service agreement with Newport City Council. Collections: weekly red bag (metals, plastics, cartons), blue bag (paper/card), food waste, textiles; three-weekly garden waste (seasonal). Wastesavers holds commercial contracts across South East Wales — including a £500,000 Caerphilly trade waste contract confirmed November 2024.

§3.4 — Wastewater / Biosolids: Dŵr Cymru Welsh Water

Operator: Dŵr Cymru Welsh Water (Dŵr Cymru Cyfyngedig). Newport facilities: 5 wastewater treatment works. Current biosolids management: land application (Biosolids Assurance Scheme certified); 60-mile haulage radius to Anaerobic Digestion plants at Port Talbot, Cardiff, and Wrexham. Land application route is under agronomic and regulatory cost pressure.

§3.5 — System Cost Summary

StreamEstimated Cost BasisSource
Residual MSW (ERF, Prosiect Gwyrdd)~£95–115/tonne gate equivalentESTIMATED
Contingency landfill£126.15/tonne landfill tax + gateVERIFIED / ESTIMATED
Biosolids (land application, Welsh Water)~£40–60/tonne equivalent Data GapESTIMATED
Food / garden waste (composting/AD)~£25–50/tonne Data GapESTIMATED
Commercial residual (private hauler)~£80–100/tonne Data GapESTIMATED

Full Whole-of-Disposal Cost (FWDC) Newport-specific: data gap. FWDC cannot be formally calculated from publicly available data. Confirmed FWDC requires direct engagement with Newport City Council waste finance team and Prosiect Gwyrdd lead authority (Cardiff City Council) under Term Sheet phase verification confidentiality arrangements.

§4 — System Performance

§4.1 — Recycling Rate Trajectory

total">
YearNewport Recycling RateWelsh TargetStatus
2019–2067.2%64%✓ Met
2022–2365.2%64%✓ Met (below prior year)
2023–24~66.6%64%✓ Met
2024–25≥70%70%✓ TARGET MET

§4.1 — Residual Feedstock Reduction Trend

total">
PeriodKerbside Residual (tpy)Change
2022/2319,859Baseline
2024 calendar year14,832−25.3%

The reduction trajectory is steep following Newport's three-weekly collection changes, Wastesavers kerbside enhancements, and communal property rollout. However, Newport's population growth (+1.7%/year, highest in Wales) partially offsets per-household reduction, creating a floor below which total system residual is unlikely to fall without further structural changes.

§5 — Feedstock Opportunity

§5.1 — System-Wide Addressable Volume Summary

CategorytpyTPD
Total system manufacturing feedstock~47,332~129.7
Immediately accessible (no contract barrier)~12,500–17,500~34–48
Conditionally accessible (post-contract/agreement)~22,332~61.2
Accessible (specialist service agreement required)~4,500~12.3

§5.2 — Addressability Table

StreamVolume (tpy)TPDAccess ClassificationPhase WindowConstraint
Food waste (captured kerbside)~5,500~15.1IMMEDIATEInitialComposting/AD contract review required
Garden waste (seasonal)~7,000~19.2IMMEDIATEInitialSeasonal variability; blending strategy required
Commercial residual (post-separation)~8,000~21.9CONDITIONALInitial–MediumCommercial hauler agreements; not ERF-committed
Kerbside residual household14,83240.6CONDITIONALMedium–ExpandedProsiect Gwyrdd contract lock to ~2040–41
HWRC residual~7,500~20.5CONDITIONALMedium–ExpandedProsiect Gwyrdd partnership; contract transition required
Biosolids (Dŵr Cymru Welsh Water)~2,500~6.8ACCESSIBLEInitial–MediumService agreement with Dŵr Cymru Welsh Water
C&D residual~2,000~5.5ACCESSIBLEMediumGate pricing at Newport City Council landfill

Access Classification reflects contractual, logistical, and regulatory constraints only — not ACM material capability limits.

§5.3 — Phase Configuration Preview

PhaseTPDFeedstock BasisAvailable Volume
Phase Initial100 TPDFood waste + garden waste + biosolids + C&D + commercial residual~34–48 TPD immediately accessible (supplementary commercial streams to capacity)
Phase Medium100 TPDPhase Initial + structured commercial residual~69 TPD
Phase Expanded200 TPDAll streams including kerbside/HWRC residual post-Prosiect Gwyrdd transition~125+ TPD (~2040+)

§6 — Infrastructure Map

The interactive infrastructure map below shows Newport's manufacturing feedstock processing and disposal facilities. Require a Google Maps API key in config.js to display the live map.

Infrastructure Map — requires Google Maps API key in config.js
WTE / ERF
Landfill
Transfer / HWRC
WWTP
ACM Candidate
Cardiff ERF — Viridor Waste Management Ltd
Trident Park, Ocean Way, Cardiff CF24 5EN · Prosiect Gwyrdd contracted route · ~350,000 tpy capacity · ~2040 expiry
Newport HWRC — Maesglas
Newport City Council · Resident drop-off · Residual to Cardiff ERF · Recycling sort on-site
Newport Landfill — Docks Way
Newport City Council (self-operated) · Contingency + asbestos-category specialist · Landfill tax £126.15/tonne (2025–26)
Wastesavers Kerbside Sort
Wastesavers Charitable Trust Ltd · Full kerbside sort service · Newport's recycling partner · Charity / social enterprise
Newport WWTPs ×5 — Dŵr Cymru Welsh Water
Five wastewater treatment works · Biosolids: land application (BAS scheme) · Under Ofwat enforcement pressure (July 2024)
ABP Atlantic Site — Port of Newport
74 acres · Clean growth hub designation · ~0.3 mi from Newport landfill · Road / rail / marine access · NCC endorsed Jan 2025

Infrastructure Summary Table

FacilityTypeOperatorLocationRole
Cardiff Energy Recovery FacilityEfW / ERFViridor Waste Management LimitedTrident Park, Ocean Way, Cardiff CF24 5ENPrimary residual MSW disposal — Newport's ERF route via Prosiect Gwyrdd
Newport HWRC (Maesglas)Household Waste Recycling CentreNewport City CouncilMaesglas, NewportResident drop-off; residual to Cardiff ERF
Newport City Council Landfill (Docks Way)Landfill — contingency/specialistNewport City CouncilDocks Way, Newport NP20Contingency disposal; asbestos-category specialist streams
Wastesavers Reuse Centre / Kerbside SortRecycling / reuseWastesavers Charitable Trust LtdNewportKerbside recycling sort and reuse partner
Welsh Water Newport WWTPs (×5)Wastewater treatmentDŵr Cymru Welsh WaterVarious sites, NewportBiosolids generation — 5 treatment works
ABP Atlantic Site, Port of NewportPort / industrial development landAssociated British Ports (ABP)South Side, South Dock, NewportPriority 1 ACM site candidate — 74 acres, clean growth hub designation

§7 — Executive Implications

Executive Implications

  • The post-contract feedstock position is unplanned. The Prosiect Gwyrdd contract runs to approximately 2040–41. Newport has no confirmed successor destination for approximately 61 TPD of residual feedstock after that date. Planning decisions taken now determine whether Newport enters 2040 with a structured alternative or faces open-market exposure in a higher-cost disposal environment.
  • Immediately accessible feedstock is sufficient for an initial 100 TPD deployment — food waste, garden waste, biosolids, C&D residual, and commercially structured trade waste total an estimated 34–69 TPD without requiring renegotiation of the Prosiect Gwyrdd contract. The phasing question is structural, not binary.
  • Cost escalation is embedded and compounding. Landfill tax increased 21.6% in a single year (2025–26). ERF gate fees are index-linked under Prosiect Gwyrdd. Biosolids land application faces nutrient limit tightening. Each stream's disposal cost trajectory points in one direction — and the current system has no natural cost ceiling.
  • Newport's population trajectory amplifies both volume and cost exposure. At +1.7% per year — the fastest growth rate in Wales — feedstock volumes from a growing population base will partially re-inflate residual totals even as per-household intensity falls. Post-2030 feedstock volumes are likely higher than 2025 levels regardless of recycling performance improvements.

Appendix A — Evidence Chain

FigureValuePublic SourceSource TypeConfidence
Kerbside residual tpy (2024)14,832WRAP Wales — Welsh Government Collections Blueprint 2025 (Newport case study)VERIFIEDHigh
Residual reduction %25% vs 2022/23WRAP Wales 2025VERIFIEDHigh
Newport recycling rate 2024–25≥70%Welsh Government — Local Authority Municipal Waste Management April 2024 to March 2025 (January 2026)VERIFIEDHigh
Newport population (mid-2024)167,899ONS mid-2024 estimate, gov.walesVERIFIEDHigh
Newport population growth rate+1.7%Welsh Government Mid-Year Population Estimates 2024 (published 2025)VERIFIEDHigh
Newport households65,000+Newport City Council Budget pageVERIFIEDHigh
Cardiff ERF operatorViridor Waste Management LimitedNRW Environmental Permit EPR/LP3030XAVERIFIEDHigh
Prosiect Gwyrdd contract signedDecember 2013letsrecycle.comVERIFIEDHigh
Prosiect Gwyrdd 25-year term25 years + 5-year optionletsrecycle.com December 2013VERIFIEDHigh
Newport primary disposal routeCardiff ERFNewport City Council — Landfill Site Clarification pageVERIFIEDHigh
Welsh Water Newport WWTPs5 sitesWelsh Water Communities website 2025VERIFIEDHigh
Landfill tax 2025–26£126.15/tonneUK Treasury Spring Budget 2025VERIFIEDHigh
Annual savings from service changes£320,000/yearNewport City Council flat collections pageVERIFIEDHigh
Kerbside recycling partnerWastesavers Charitable Trust LtdWRAP 2025; Caerphilly Observer November 2024VERIFIEDHigh
Newport ERF disposal cost per tonne£95–115/tonneEstimated — Prosiect Gwyrdd commercial terms not publicly disclosedESTIMATEDLow

Appendix B — Change Factors

Factors that would materially change the diagnostic findings:

#FactorDirectionMechanism
1Prosiect Gwyrdd contract extension or early exitEither5-year extension option defers Phase Expanded by 5 years; early partial release increases immediately accessible volume
2Welsh Government recycling target escalation above 70%Downward on residual volumeAny further statutory target increase reduces residual stream volumes in the medium term
3Newport population growth accelerationUpward on feedstock volumeAt +1.7%/year, any acceleration increases total feedstock faster than efficiency improvements reduce per-household intensity
4Dŵr Cymru Welsh Water regulatory enforcement outcomeUpward on biosolids cost pressureOfwat enforcement action (July 2024) could result in investment obligations affecting biosolids volume, composition, and disposal economics
5UK landfill tax further escalationUpward on disposal costThe 21.6% 2025–26 increase signals continued escalation. Any further increases widen the economic gap between disposal and ACM arrangement
6Commercial separation compliance maturityUpward on commercial stream availabilityAs Welsh businesses comply fully with April 2024 mandatory separation rules, commercially available non-contracted residual feedstock increases in volume and quality
7Wastesavers contract renewal structureStructuralAny change in Newport's kerbside recycling contract structure affects food waste and garden waste logistics for ACM

Appendix C — Sources and References

SourceTypeDateRelevance
Welsh Government — Local Authority Municipal Waste Management: April 2024 to March 2025Official statisticsJanuary 2026Newport recycling rate 2024–25; Wales-wide performance context
WRAP Wales — Welsh Government Collections Blueprint 2025: Newport Residual Waste Reduction Case StudyGovernment-commissioned research2025Kerbside residual tonnage 14,832 tpy; 25% reduction; food waste capture improvements
WRAP Wales — Communal Residual Waste Collections Newport Case StudyCase study2025Communal property feedstock management programme
Natural Resources Wales — Environmental Permit EPR/LP3030XA (Cardiff ERF)Regulatory permitActive (NRW)Viridor Waste Management Limited confirmed as Cardiff ERF operator
Newport City Council — Landfill Site Clarification (August 2018)Council communications2018Confirms Cardiff ERF as primary route; Newport landfill as contingency
Newport City Council — Budget and Finance PageCouncil communications2024–25Population: 160,000+ people; 65,000+ households
letsrecycle.com — Viridor Signs 25-Year Prosiect Gwyrdd EfW DealIndustry newsDecember 2013Prosiect Gwyrdd contract details, partner authorities, term, value
Welsh Water Communities Website — NewportWelsh Water20255 wastewater treatment works confirmed; active investment programme
Ofwat — Enforcement Investigation: Dŵr Cymru Welsh WaterRegulatory enforcementOpened July 2024; minded-to December 2025Regulatory pressure on Welsh Water wastewater assets
UK Treasury — Spring Budget 2025 Landfill TaxHMRC / Treasury2025Landfill tax £126.15/tonne from April 2025–26
ONS — Mid-Year Population Estimates 2024 (gov.wales)Official statistics2025Newport population 167,899; +1.7% growth rate
Welsh Government — 'Beyond Recycling' Strategy 2021Strategy2021Statutory 70% target; future direction framework
My Recycling Wales — Newport City Council ProfileWRAP-managed information resource2024–25Collection service configuration; Wastesavers role
Caerphilly Observer — Wastesavers Trade Waste Contract November 2024NewsNovember 2024Wastesavers current operational status and expansion
Companies House — Viridor Limited (02456473)Companies HouseActive to March 2026Viridor confirmed as active UK company
Carbotura standard performance baseline (400 TPD)Carbotura, Inc.2026Basis for employment, economic impact, and carbon metric estimates

Appendix D — Authoritative Glossary

This glossary is authoritative for the Newport City Council document suite. Terms must be applied consistently across all four documents.

ACM (Advanced Circular Manufacturing)
Carbotura's modular manufacturing platform. Converts community manufacturing feedstock into manufactured products including graphene, graphite, hydrogen, and ultrapure water. Designed and permitted as manufacturing infrastructure — not waste processing.
Access Classification
Classification describing the contractual, logistical, or regulatory condition governing a stream's availability for ACM deployment. Values: IMMEDIATE, CONDITIONAL, ACCESSIBLE. Does not imply any material capability limit.
Biosolids
The treated solid material produced by wastewater treatment. Managed by Dŵr Cymru Welsh Water at five Newport treatment works. Currently land-applied under the Biosolids Assurance Scheme; a feedstock stream under increasing regulatory and agronomic cost pressure.
Cardiff Energy Recovery Facility (Cardiff ERF)
The Energy Recovery Facility at Trident Park, Ocean Way, Cardiff, operated by Viridor Waste Management Limited. Treats 350,000 tpy of residual material from five Prosiect Gwyrdd partner authorities including Newport. Operational since 2014 (full services April 2016).
Circular Supply Agreement (CSA)
The 30-year agreement between Carbotura and a community governing feedstock supply, Beneficiation Fee obligations, and Circular Royalty™ payments. Not a waste disposal contract — a manufacturing feedstock supply agreement.
Circular Royalty™
A contractual payment from Carbotura to the feedstock-supplying community, structured as a percentage of the Year 1 Beneficiation Fee, on a rolling monthly basis beginning 13 months after the first Beneficiation Fee payment, and escalating annually. At steady state, the Circular Royalty™ per tonne exceeds the Beneficiation Fee per tonne — both are reported as separate transactions per the Separate Transaction Principle (MR §4.8) and never netted. The Circular Royalty™ formula is contractually locked at CSA execution; it is not determined at feasibility.
Dŵr Cymru Welsh Water
The not-for-profit water and wastewater company serving Wales and parts of England (legal name: Dŵr Cymru Cyfyngedig). Operates five wastewater treatment works within Newport's boundary. Manages Newport biosolids under land application and the Biosolids Assurance Scheme.
Full Whole-of-Disposal Cost (FWDC)
The blended cost per tonne of all manufacturing feedstock streams across the community's system, accounting for all disposal, treatment, collection, and transport costs. confirmed during Term Sheet phase verification.
Manufacturing Feedstock
Material generated by Newport City Council's community that Carbotura's ACM platform processes as input materials. In Carbotura's framework: never "waste," "garbage," "residual," or "refuse."
Natural Resources Wales (NRW)
The environmental regulator for Wales. Responsible for validating local authority waste data submitted via WasteDataFlow, and for issuing and regulating environmental permits for waste facilities.
Prosiect Gwyrdd (Project Green)
The regional residual waste partnership between Caerphilly, Cardiff (lead authority), Monmouthshire, Newport, and Vale of Glamorgan councils. Contracted with Viridor Waste Management Limited in December 2013 for a 25-year term (plus 5-year extension option) to treat combined residual municipal waste at the Cardiff ERF.
Beneficiation Fee (Total Manufacturing Contribution Fee)
The per-tonne fee paid by the community to Carbotura under the Circular Supply Agreement, covering ACM manufacturing arrangement. Annual escalator: 2.5%. Set by formula below the verified FWDC.
Viridor Waste Management Limited
The operator of the Cardiff Energy Recovery Facility under the Prosiect Gwyrdd partnership contract. A UK recycling, renewable energy, and waste management company owned by KKR. Active under current name confirmed via NRW permit (EPR/LP3030XA) and Companies House (accounts filed to March 2025).
WasteDataFlow
The UK-wide waste data reporting system, managed in Wales by Natural Resources Wales. All Welsh local authorities report quarterly waste collection, treatment, and disposal data via WasteDataFlow.
Wastesavers Charitable Trust Ltd
Newport's kerbside recycling collection partner. A social enterprise and charity based in Newport, operating weekly kerbside-sort collections across all Newport households and providing commercial recycling services across South East Wales.
Was this analysis useful? Rate this document
Feedstock System Assessment · DOC 01 OF 06

What this document isBeth yw’r ddogfen hon

How Newport City Council’s residual stream is generated, routed and paid for today, and the share that qualifies as manufacturing feedstock.Y man cychwyn ar gyfer dogfennau’r rhaglen.

Three things this document saysTri pheth y mae’r ddogfen hon yn ei ddweud
  1. Newport City Council is at a decision point: the deployment timetable runs from execution, so the decision date sets the commissioning date.Cyngor Dinas Casnewydd: mae’r amserlen yn dechrau o’r dyddiad llofnodi, felly’r dyddiad penderfynu sy’n gosod y dyddiad comisiynu.
  2. Advanced Circular Manufacturing converts the residual stream into products under one agreement, with no counterparty capital committed.Mae Gweithgynhyrchu Cylchol Uwch yn trosi’r ffrwd weddilliol yn gynnyrch o dan un cytundeb, heb gyfalaf gan y cyngor.
  3. The Beneficiation Fee and the Circular Royalty™ are independent transactions, reported separately and never netted against each other.Mae’r Ffi Fuddiannu a’r Royalty Cylchol yn drafodion annibynnol: cânt eu dangos ar wahân ac ni chânt eu net-io byth.
Looking for something else?Chwilio am rywbeth arall?